
SUPPLY AND INSTALLATION OF A WATER TREATMENT PLANT
Installation and operation of the water treatment plant, which involved the pumping of Nile River water into a sedimentation tank

FABRICATION OF AN ELEVATED 169M3 GALVANIZED STEEL WATER TANK IN TATU CITY
Successfully executed within the expansive Tatu City, a mixed-use development spanning 5000 acres and boasting of Special Economic Zone status.

BOREHOLE EQUIPPING & FABRICATION OF A STEEL TANK
The system is intended to serve the entire premises, which accommodates more than 300 workers, providing a reliable water supply for all their needs.

BOREHOLE EQUIPPING AND SERVICING AT JKIA
Our expertise in executing water projects ensures that the boreholes will significantly address the airport's water demands

CONSTRUCTION OF A WATER RECOVERY SYSTEM -ATHI RIVER FACTORY
Successfully installed and commissioned an impressive 8-meter high, 65,000-liter steel tank for B Braun Pharmaceuticals Manufacturing Plant in Athi River, EPZ.

SOLARISATION OF A 230m BOREHOLE AND FABRICATION OF AN ELEVATED STEEL WATER TANK AT MACHAKOS JUNCTION
Our team crafted an elevated steel tower and mounted solar panels on top to power the pump, ensuring a yield of 10m3 per hour.

SOLARISATION OF A BOREHOLE AND FABRICATION OF A STEEL WATER TOWER
Installation of a solar pump and construct a towering 12-meter steel water structure with two massive 10,000-liter steel tanks.